Three practicable processes / Only limited quality control feasible (D) - The four-year project on rapid detection methods for contamination in waste wood, funded by Deutsche Bundesstiftung Umwelt (DBU), Osnabrück, will come to a close at the end of the year. The project had shown that, within its framework, no ...
DBU project on rapid analysis of waste wood soon to be concluded
You can only use this article with a valid subscription and registration. Registered subscribers can access all articles after entering their user name and password.
- Ad -