Study released on correction factor for R1 criterion for waste-to-energy plants

R1 status for less than half of affected wte plants

|

(BE) – The Belgian consulting firm Clerens Consulting has released its final report on a “climate correction factor” for the R1 criterion to calculate the energy efficiency of waste-to-energy (wte) plants. The proposed options are based on the number of local heating degree days (HDD), which serve as a measure ...

Read more

You can only use this article with a valid subscription and registration. Registered subscribers can access all articles after entering their user name and password.
- Ad -

Article categories
- Ad -